Ormes Road, Neath
Scheduled to being on site in 2021, this new home is due to replace a dilapidated house already on the site. The site offered an interesting challenge, being located on a bank with difficult infrastructure.
RIBA Stages | 0 - 3 |
Location | Neath |
Client | Private Client |
Engineer | Grade Consulting |